The Sea-Oat Mounds at Surfside's Beach Entrances Are There to Slow a Storm

Why does each beach entrance in Surfside now open between low, triangular mounds of sand planted with sea oats? The Town calls them diverter dunes, and they are built to slow a storm surge that breaks through a gap in the dune line, then let the seawater drain back out. Every beach entrance is a gap in the dune line, which is why the mounds sit there.

That one design choice explains most of what changed on the beach this year. The Town's Dune Restoration and Beautification project ran between 87th and 96th Streets. It raised the dunes, replanted native vegetation, rebuilt the walking path and added post-and-rope fencing along it. The walk you take most mornings now follows a coastal-defense plan.

What a Diverter Dune Actually Does

The November 2026 Surfside Gazette describes the new mounds as "independent, low, triangular-shaped sand mounds planted with sea oats." They are meant to "reduce the energy of storm surge while also allowing seawater to recede, helping to limit the movement of water and sand inland during significant storm events."

The same article says Surfside's original diverter dunes were the first of their kind installed in Florida. The 2026 work adds more of them. The Gazette lists four improvements in all:

  1. The existing dunes were restored and raised for better coastal protection.
  2. New diverter dunes were added at breaks in the dune system.
  3. Native dune vegetation was restored to hold the sand in place.
  4. The existing pedestrian walking path was improved.

The August Town Manager report shows how the pieces fit together on the ground. Diverter dunes went in "at each beach access point" to "help direct pedestrian circulation and enhance dune protection." So the mounds do two jobs. They spread out water during a storm, and on ordinary days they guide foot traffic away from the planted dune and onto the access path.

Raising the dunes also meant bringing in sand. The Town's June report describes imported sand used to lift the dune crest. That's why parts of the dune line now sit higher than they did in spring.

The Path Was Redesigned Before Anyone Broke Ground

The walking path is the part of the project you use every day, and it is also the part that took the longest to get right. On December 9, 2025, the Town Commission rejected the first round of bids and ordered the project rebid. Kimley-Horn and Associates, the Town's design consultant, then revised the plans "within a portion of the dune walking path area" so the surface would match the Town's approved walking-surface specifications and fix performance problems in one segment. The memo says the changes were meant to improve "durability, accessibility, and overall project continuity."

The new invitation to bid went out January 8, 2026, and bids were due February 17. According to the bid award memo, Dickerson Infrastructure bid $2,549,630.60, about $481,000 less than the next bid, $3,030,967.50 from Gonzalez and Sons Equipment. Dickerson won the contract.

Construction started May 11, 2026, and the path was built from north to south. By the August 11 Town Manager report, Dickerson had finished the path from 96th Street down to 93rd Street. Crews were laying "Surfside mix," the Town's walking surface, south of 93rd and putting up post-and-rope fencing along the finished sections, starting at 96th Street. That report also notes that the Commission cut the concrete benches from the contract.

The schedule slipped a little along the way. The June report expected completion on August 10, and the August report moved construction completion to September 8. By the October 13 Town Manager report, Dickerson had finished the work, and the Town's capital projects team and Kimley-Horn were doing final quality checks and punch-list items. That report lists $1,967,200 paid on the contract, or 77 percent.

Writing in the October Gazette, Commissioner David Weingot described the dune and beach walking path as "underway and open" and encouraged residents to "enjoy the views and sound of the waves."

One more detail shows how the Town is paying for the dunes. The Commission amended the development order for Ocean House, at 9309–9317 Collins Avenue, so that the project contributes to the dune restoration. The November Gazette says the goal is to offset costs that would otherwise fall on residents.

Starting at 96th Street

The path was built from the north end first, so 96th Street is the natural place to start a walk. It is also where most of Surfside's beach activity happens this season.

  • 96th Street Park is open daily from 8 a.m. to 9 p.m., according to the October 13 report.
  • The 96th Street beach entrance is one of the two Surfside entrances the Town lists with wheelchair access. The other is at 88th Street.
  • The 96th St. Surfside Farmers Market has been open since early October on the Surfside side of the 96th Street beach entrance. It runs Saturdays and Sundays from 9:30 a.m. to 3:30 p.m. through May 2027.
  • Under the Stars Movie Night shows Space Jam at 96th Street Park on Saturday, November 7, at 7:30 p.m.

A weekend morning works well at this end: walk the path south, then come back up to the market. The post-and-rope fencing and the new plantings went in this summer, so the restored vegetation has had only a few months to establish.

The Middle Stretch, From the Community Center to 92nd Street

The Community Center anchors the middle of the beachfront, and its chair service is the most practical beach update this fall. Beach Time Max runs the daily Beach Chair Service, which is open only to Surfside residents. Check in at the Community Center front desk. Each household gets two chairs and one umbrella per day, and the service follows the lifeguard tower's hours, which were 10:30 a.m. to 6:30 p.m. in October.

There's more on the way. Commissioner Weingot wrote in the October Gazette that the new budget pays for more chairs, longer hours and cold water service at the Community Center beach.

The November Gazette calendar lists Music on the Beach – Classic Rock for Sunday, November 15, at 4 p.m.

If you walk to the beach from the west side of town, expect construction on 92nd Street. The Abbott Avenue drainage project adds two pump stations and force mains to reduce flooding on Abbott Avenue between 90th and 94th Streets. In October, FG Construction was laying pressure pipe west along 92nd Street, with rolling road closures at whichever intersections crews were working. The report said a second crew would be added to keep the schedule, and the Town expects the project to finish November 23, 2026. The original completion date was August 27.

The drainage work and the dune project address the same problem from different sides. The pump stations deal with water collecting in the streets. The diverter dunes are meant to keep storm surge from coming in off the ocean.

The South End at 88th Street

The restored dunes end near 87th Street. The 88th Street entrance is the southern of the two wheelchair-accessible beach entrances.

The 88th Street street-end park is also the approved site of the permanent Champlain Towers South memorial. The Town Commission gave final approval to the design on August 6. Hands are its central image, and recovered building material is set into 13 pillars of light. As of the October 13 report, the permit approval process was in its final stages and the Town was finalizing its construction contract with Shiff Construction. No start date had been set.

Veterans Park is at 8750 Collins Avenue. The Town's Veterans Day Ceremony is there on Wednesday, November 11, at 10 a.m. Town Hall is closed that day.

From 96th Street to 88th, the full walk takes you past the beach entrances and their new sea-oat mounds. The Town's park information page still lists the Beach Hard Path Fitness Trail, with eight workout stations between 89th and 95th Streets.

At Mastery of RE, we follow projects like Surfside's dune restoration because they change everyday life on the beachfront, from where you walk onto the sand to how the shoreline handles a storm. If you'd like to talk about how your stretch of Surfside between 87th and 96th Streets is changing, we're happy to share what we know. Work With Us.

Work With Us

Want an agent who'll really listen to what you want in a home? Need an agent who knows how to effectively market your home so it sells? Give us a call! We are eager to help and would love to talk to you.

Follow Us on Instagram